ANALISIS KINERJA KONTRAKTOR BERDASARKAN JENIS POLA RANTAI PASOK KONSTRUKSI PADA BEBERAPA PROYEK DI SURABAYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(*) Corresponding Author
Abstract
Full Text:
PDFReferences
Ahuja, H. N., Dozzi, S. P., & Abourizk, S. M. (1994). Project Management: Techniques In Planning And Controlling Construction Projects. John Wiley & Sons
Badan Pusat Statistik. (n.d.). Istilah. Retrieved from https://www.bps.go.id/istilah/index.html?Istilah%5Bberawalan%5D=K&Istilah_page=5
Bertelsen, S. (2002). Bridging the Gap – Towards a Comprehensive Understanding of Lean Construction. Proceedings IGLC-10, 1-13. https://leanconstruction.org.uk/wp-content/uploads/2018/09/Bertelsen-2002-Bridging-the-Gaps-Towards-a-Comprehensive-Understanding-of-Lean-Construction.pdf
Chopra, S. and Meindl, P. (2004). Supply Chain Management. Pearson Education.
Cooper, M.C. and Ellram, L.M. (1993). Characteristics of Supply Chain Management and the Implications for Purchasing and Logistics Strategy. The International Journal of Logistics Management Vol. 4 No. 2 (pp. 13-24). https://doi.org/10.1108/09574099310804957
Ilham, M. R. (2019, April 5). Hubungan Pengendalian Mutu Proyek dengan Waktu, Biaya, dan Kualitas. http://muhammadrizalmiilham.blogspot.com/2019/04/hubungan-pengendalian-mutu-proyek.html
Occupational Health and Safety Assessment Series, B. S. (2007). 18001: 2007. Occupational Health and Safety Management.
Paulson, L. D. (2001). Understanding Supply Chain Management. IT Professional, 10-13. https://dl.acm.org/doi/10.5555/612990.613086
Susilawati. (2005). Studi Supply Chain Konstruksi Pada Proyek Konstruksi Bangunan Gedung. (Thesis). Institut Teknologi Bandung. https://doi.org/10.5614/jts.2006.13.3.1
Tommelein, I. D.; Walsh, K. D.; Hershauer, J. C. (2003). Improving Capital Projects Supply Chain Performance. Research Report PT172-11. Construction Industry Institute. 241 p.
Vrijhoef, L. K. (2000). The Four Roles Of Supply Chain Management In Construction. European Journal of Purchasing & Supply Management, 169-178. https://doi.org/10.1016/S0969-7012(00)00013-7
Widoyoko, S. E. P. 2009. Evaluasi Program Pembelajaran. Pustaka Belajar, Yogyakarta
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :