Analisis dan Usulan Perbaikan untuk Defect Pemasangan Lift
(1) Industrial Engineering Department, Petra Christian University, Indonesia
(2) Industrial Engineering Department, Petra Christian University, Indonesia
(*) Corresponding Author
Abstract
PT Kone Indo Elevator is a company engaged in elevators and escalators. The elevator often jams or errors when run, due to poor installation quality. PT Kone Indo Elevator strives to continue to develop the quality of the elevator installation using the PDCA method. The plan of PT Kone Indo Elevator is to replace QD+ hardcopy with QD+ online, so that supervisors can conduct QC without any hindrance. However, in order to make QD+ online work well, KPIs, QC schedules for supervisors, and training for technicians and supervisors are made.
Keywords
elevators, PDCA, QC, KPIs
Full Text:
PDFRefbacks
- There are currently no refbacks.