Upaya Peningkatan Value Afval di PT.X
(1) Industrial Engineering, Petra Christian University, Surabaya
(*) Corresponding Author
Abstract
PT X is a manufacturing company engaged in the production of cosmetics. Afvals in PT X are production leftovers from the company’s primary products, such as bottle, compact, pot, cap, and lipstick. The afvals are differentiated into four categories: A, B, C, and D. Afvals “A” (class I afval) are clean and not contaminated by other materials such as dust, dirt, and oil. Afvals “B”, “C”, and “D” (class II afval) are contaminated by those materials. Afvals “A” have higher selling price than the other types of afvals. The purpose of this research is to increase the amount of afvals “A” by reducing the amount of class II afval. This research was done by doing some observation in the production line that produce afvals and using five whys method to analyze the source of afval. The improvements were made by using 5W 2H technique. The improvement that already implemented was sorting the decorated and plain products in the assembly area, by assembly operator. The sorting time already consider the idle time of the assembly operator. As results, afvals “A” was increase by 0.5% afvals “D” was decrease by 1.6%.
Keywords
afval; five whys technique; 5W 2H; sorting
Full Text:
PDFReferences
Gaspersz, V., Lean Six Sigma, Gramedia Pustaka Utama, Jakarta, 2007
Charron, R., Harrington, H. J., Voehl, F., & Wiggin, H., The Lean Management Systems Handbook, CRC Press, New York, 2015
Tague, N. R., The Quality Toolbox, ASQ Quality Press, Wisconsin, 2005
Muchemu, D., How to Write Standard Operating Procedures and Work Instructions, Createspace Independent Publishing Platform, California, 2012
Refbacks
- There are currently no refbacks.