Minimalisir Waste dalam Upaya Pengurangan Waktu Proses Produksi PT X

Bobby Setiawan(1*), I Gede Agus Widyadana(2),


(1) Industrial Engineering, Petra Christian University, Surabaya
(2) Industrial Engineering, Petra Christian University, Surabaya
(*) Corresponding Author

Abstract


PT X produce heat exchanger where one of their line production is CU Condensor line which produce condensor. Problem faced is, production process takes longer than estimate cycle time. Suspected wastes that cause production process run slower. Therefore, Waste Assesment Model (WAM) is built to know what critical waste is and find that waste defect that need more attention to solve. Further, it is strived to reduce waste defect by using Root Cause Analysis to reduce waste defect. Analysis result show that the biggest defect is painting problem, and 81.3% of them are sagging, peel off, and unpainted part. Three kind of defective are searched for root cause use cause & effect diagram. Each root cause are solved with solution in hope to reduce defect until 36.74%. The reduction of defect percentage can reduce repair time and indirectly reduce the production process time of the condenser unit.


Keywords


waste assessment model; root cause analysis; reduction waste; defect control

Full Text:

PDF

References


Vorley, G., Mini Guide to Root Cause Analysis, Quality Management & Training Ltd, United Kingdom, 2008.

Khanan, M., and Haryono., Analisis Penerapan Lean Manufacturing untuk Menghilangkan Pemborosan di Lini Produksi PT Adi Satria Abadi, Jurnal Rekayasa Sistem Industri, 4(1), pp. 47-54.

Okes, D., Root Cause Analysis: The Core of Problem Solving and Corrective Action, ASQ Quality Press, Wisconsin

Rawabdeh, I., A model for the Assesment of Waste in Job Shop Environments, International Journal of Operatrion & Production Management, 25(8), 2005, pp. 800-822.

Webber, L., and Wallace, M., Quality Control For Dummies, Wiley Publishing, Inc., Indianapolis, 2007.


Refbacks

  • There are currently no refbacks.