Pengaturan Sistem Injection pada PT. XYZ
(1) Industrial Engineering Department, Petra Christian University
(*) Corresponding Author
Abstract
Shoe-making process at PT. XYZ is divided into two major parts, upper and sole (full-shoe). The company has updated one of the machines to increase the capacity of the production line. This set up will affect several factors, such as the number of work stations, the number of operators, and the layout. The number of work stations required is obtained by dividing the operation standard minute with machine cycle time. The new injection system required 28 work stations, i.e., 3 station more than the initial system. The number of man power required will follow the number of work stations. Efficiency that can be achieved by new injection system is 94%, that is more better than initial counting.
Keywords
Full Text:
PDFReferences
Wignjosoebroto, S. (2006). Pengantar Teknik dan Manajemen Industri. Surabaya: Guna Widya.
Heizer, J. d. (2009). Manajemen Operasi. Jakarta: Salemba Empat.
Sutalaksana, I. Z. (2006). Teknik Tata Cara Kerja. Bandung: Jurusan Teknik Industri-ITB.
Refbacks
- There are currently no refbacks.