Pengoptimalan Jumlah Man Power dengan Metode Work Force Analysis

Christian Wibisono(1*), I Nyoman Sutapa(2),


(1) petra christian university
(2) petra christian university
(*) Corresponding Author

Abstract


The purpose of this study is to minimize man power cost. The main problem of this company is that ineffective time by workers at delivery area is very big. It happens because supervisor does not count the time that workers need to do their job yet. The improvements for this problem are giving total number of man power according the standard time and making a preparation schedule so every shift has a balance workload.

Keywords


Work Force Analysis, Preparation Schedule

Full Text:

PDF

References


Wignjosoe Broto, S. Ergonomi, Studi Gerak dan Waktu. Jakarta, 1992.

Sutalaksana, I.Z. Teknik Tata Cara Kerja. Teknik Industri Institut Teknologi Bandung, 1979.

Sutalaksana, I.Z. Teknik Perancangan Sistem Kerja. Teknik Industri Institut Teknologi Bandung, 2006.

Martoyo, S. Manajemen Sumber Daya Manusia, Yogjakarta, 2000.


Refbacks

  • There are currently no refbacks.