Standarisasi Lintasan Kerja Penjahitan Sepatu pada PT XYZ

Cerianto Chandra(1*), I Gede Agus Widyadana(2),


(1) Petra Christiann University
(2) Petra Christian University
(*) Corresponding Author

Abstract


PT. XYZ is a company engaged in manufacturing shoes. Work line at PT. XYZ have two varies cause many differences. The purpose of this study is to standardize the existing work line on PT.XYZ with the same number of people in the work line. The research was done by getting the raw time of shoes, shoe making sequence, production capacity, and working hours. Determination of the number of operators is done by line balancing in the hope that the number of people selected can have the desired line balance variance. Layout arrangements are required to support the selection of proposed work line. The results of the analysis show that the number of operators is 47 people with line balance variance of 92%. The total capacity that can be obtained with 47 people is 69613 pairs, greater than the current total production of 69493. The number of required operators reduced 40 people compared with the current conditions. The required investment cost is Rp. 1,849,070,000

Keywords


Line Balancing; Line Balance Variance; Production Capacity; Producution Layout

Full Text:

PDF

References


Elsayed, Analysis and control of production systems, Prentice-Hall, Inc, United States of America, 2004

Purnomo, Hari, Pengantar Teknik Industri, Graha Ilmu, Yogyakarta, 2004.

Sulistyadi K, Perancangan Sistem Kerja dan Ergonomi, Universitas Sahid Press, Jakarta, 2003


Refbacks

  • There are currently no refbacks.